Winterization Post-Season Guide

Get your site winter-ready before the winter storms arrive

See The Checklist

Winterization protects your land, your water and your permit. Here is what the State Water Board expects from every cannabis cultivator, every year.

The winterization checklist

Complete these every year before the winter period starts. The Mitigation Report in your Site Management Plan lists additional steps specific to your property.

Drainage & roads

  • Clear culvert inlets, outlets and trash racks of debris and sediment
  • Check outlets for erosion undermining the culvert
  • Repair wheel ruts, rills and gullies on road surfaces
  • Block seasonal access roads to motor vehicles until the winter period ends

Secure materials

  • Store fertilizers, pesticides and petroleum products outside riparian setbacks, covered, with secondary containment
  • Secure anything synthetic that wind or rain could carry away
  • Collect trash and take it to a waste transfer facility

Water & facilities

  • Seal water tanks and bladders so wildlife cannot enter or become trapped
  • Drain or insulate water lines where temperatures drop below freezing
  • Remove chemical toilets, or service them and leave them unused

Stop erosion before it starts

Bare soil is the biggest winter risk. The goal is to keep every bit of sediment out of Waters of the State.

Cover and stabilize

  • Seed exposed soil with native, non-invasive grasses and cover with weed-free straw mulch
  • Apply straw mulch at about two tons per acre, secured where site conditions call for it
  • Stabilize disturbed areas and construction entrances and exits
  • Seed and mulch fill pads and fill slopes right away

Capture sediment

  • Install silt fences or straw wattles along the toe, face and grade breaks of exposed slopes
  • Maintain every sediment control feature through the winter
  • Surface footpaths and secondary roads used in wet weather
  • Have permanent controls designed and built by qualified professionals

Soil, spoils & spent growing medium

Stored soil and spent media can leach nutrients and sediment into groundwater and streams if left uncovered.

Cover it

Keep potting soil and amendments covered and secured when not in use. Cover and berm any stockpile that won't be used within 48 hours.

Contain it

Store spent growth medium under plastic sheeting or in watertight dumpsters, away from the riparian setback and waters of the state.

Dispose or reuse properly

Send spent medium to an authorized landfill, or reuse it in garden beds or on a stable, revegetated surface with erosion controls.

Close out your METRC records in advance

Everything on the property should be accounted for and wrapped up to your track-and-trace records before you walk away, not after. Getting entries current now means you aren’t scrambling, or leaving gaps, while you’re out of town.

Record it on time

24 hrs · 72 hrs

Most activity, including receipt, destruction or disposal, packaging, lab testing, and sales or donations, must be recorded in track and trace within 24 hours.

Cultivation milestones (planting, moving to canopy, flowering, tagging, plant destruction, harvesting) must be entered within three calendar days (72 hours).

When in doubt, enter it the same day.

Document destruction & disposal

Who · Why · How

For any destruction or disposal, the entry's notes must include who did it, why and how.

Harvested plants still drying, curing or being trimmed don't need tags, but they must still be recorded.

Reconcile your inventory

Every 30 days

On-site inventory must be reconciled with your track-and-trace records at least once every 30 days.

Do a final count before you leave, and include a reason for any package adjustment that changes a recorded quantity.

24 hrs · 72 hrs

Record it on time

Most activity, including receipt, destruction or disposal, packaging, lab testing, and sales or donations, must be recorded in track and trace within 24 hours.

Cultivation milestones (planting, moving to canopy, flowering, tagging, plant destruction, harvesting) must be entered within three calendar days (72 hours).

When in doubt, enter it the same day.

Who · Why · How

Document destruction & disposal

For any destruction or disposal, the entry's notes must include who did it, why and how.

Harvested plants still drying, curing or being trimmed don't need tags, but they must still be recorded.

Every 30 days

Reconcile your inventory

On-site inventory must be reconciled with your track-and-trace records at least once every 30 days.

Do a final count before you leave, and include a reason for any package adjustment that changes a recorded quantity.

  • Harvests entered, with all batches and weights recorded
  • All plant waste, trim and spent material recorded and disposed of properly
  • Remaining inventory counted, matched to METRC and stored securely
  • Transfers, sales, donations and lab results entered and complete
  • Unused plant and package tags accounted for
  • Someone who can log in to METRC while you are away, since any loss of access to the system lasting more than 72 hours must be reported to the Department
  • Nothing left pending that someone else would need to finish while you're away
Check the details for your license.

Time limits come from California's track-and-trace regulations (4 CCR §15049) and the Department of Cannabis Control's cultivator self-inspection checklist, which says it is not an exhaustive list. Confirm the rules for your license type with the Department (info@cannabis.ca.gov, 1-844-612-2322) or your Flowra advisor.

Heading out of state? Your site’s obligations stay

Many growers leave the property, or the state, once harvest wraps. Your winterization requirements don’t pause when you do. The rules apply to the site for the entire winter period, whether or not anyone is there.

Finish before you go

  • Complete drainage work, seeding, mulching and sediment controls while you're still on site
  • Remove or service chemical toilets and seal tanks and bladders
  • Drain or insulate water lines in areas that freeze
  • Block seasonal access roads and store all materials covered and contained
  • Bring your METRC records fully up to date, with nothing left to reconcile

Plan for what you can't watch

  • Sediment controls must keep working all winter, so someone needs to be able to check and maintain them after storms
  • Heavy equipment is off-limits all winter, other than emergency repairs under an enforcement order, so a problem you can't fix remotely needs to be prevented now
  • Check your Site Management Plan for site-specific winter measures before you leave